Anonymous
×
Create a new article
Write your page title here:
We currently have 205 articles on Shadowrun Seattle Shutdown. Type your article name above or click on one of the titles below and start writing!



Shadowrun Seattle Shutdown
Revision as of 16:09, 4 May 2023 by Arcology Expert Program (talk | contribs) (Created page with "Category:Content The SCIRE's stairwells are integrated into the design of all superlifts starting at {{Level|16}} and ending at {{Level|300}}. The lower levels are arranged differently to accommodate the loadbearing needs of the lower floors and basements, while the upper most levels were not constructed as superlifts in the first place. Each level follows one of two floor plans,")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

The SCIRE's stairwells are integrated into the design of all superlifts starting at Level 16‌ and ending at Level 300‌. The lower levels are arranged differently to accommodate the loadbearing needs of the lower floors and basements, while the upper most levels were not constructed as superlifts in the first place. Each level follows one of two floor plans,